Excavation process: all variables take 1e+38 value
Posted: Sat Jul 17, 2021 2:14 pm
Hello everyone,
I am modelling an excavation process which has 500 days for stabilizing conditions (from -500 to 0) and 14 days to excavate the layer (from 0 to 14). When the calculation arrives to the 0.2 days all variables take values of 1e+38. I have changed BC in many ways so i don't think the problem is there.
Anyone has anyclue on where the problem might be?
Thank you very much,
I am modelling an excavation process which has 500 days for stabilizing conditions (from -500 to 0) and 14 days to excavate the layer (from 0 to 14). When the calculation arrives to the 0.2 days all variables take values of 1e+38. I have changed BC in many ways so i don't think the problem is there.
Anyone has anyclue on where the problem might be?
Thank you very much,